The UK could reach net zero faster and save almost £50bn by 2050 with a renewables-led energy system supported by decarbonised gas and long duration storage, alongside electricity market reform and network coordination.
Jan De Nul Group’s Cable Laying Vessel Willem de Vlamingh has successfully installed the four export cables with a total length of 34 km on the 376MW Formosa 2 offshore wind farm in Taiwan.
Equinor has confirmed it has bid for floating offshore wind in ScotWind, the competitive tender offshore wind seabed leasing round being undertaken by Crown Estate Scotland.