The UK could reach net zero faster and save almost £50bn by 2050 with a renewables-led energy system supported by decarbonised gas and long duration storage, alongside electricity market reform and network coordination.
Vestas and Iberdrola have finalised the turbine supply contract for the Baltic Eagle project being developed off the island of Rügen, in German waters of the Baltic Sea.
At the same time, the Danish Energy Agency has narrowed down the site for the wind farm from 440 km2 to 286 km2 as a result of the site-investigations.