1.3 C
New York

Tag: Wärtsilä

Wärtsilä will supply its solutions for four new PIL container ships

Wärtsilä Fuel Gas Supply System (FGSS) will feed LNG fuel to power both main and auxiliary engines from the vessel’s 7500 m3 membrane tank.

Wärtsilä to supply its hybrid propulsion system for four new heavy lift vessels

Wärtsilä’s innovative hybrid system will minimise the ships’ CO2 emissions, thus supporting the marine sector’s decarbonisation ambitions.

Wärtsilä’s solutions selected for world’s largest LPG/Midsize gas carriers

The 46,000 m3 capacity vessels will be the largest of their kind in the world, and there is an option for two additional ships as well.

Wärtsilä to act as system integrator for BMIS

The BMIS model will be built around a combined vessel spread comprising of a Piling Installation Vessel, a WTIVLight and Service Operation Vessels.

Wärtsilä will retrofit the 40 metre long vessel owned by Hidrovias do Brasil

The technology group Wärtsilä will carry out the most complete re-powering project ever carried out on an inland waterway vessel.

Carisbrooke Shipping significantly reduces CO2 emissions

Carisbrooke Shipping has reported a saving of over 600 tons of CO2 emissions since the beginning of the year with the help of Wärtsilä’s Fleet Optimisation Solution (FOS).

Wärtsilä to provide electrical package for German research vessel

The technology group Wärtsilä will provide and integrate the electrical system package for a new German research vessel.

Brazil’s CBO Group and Wärtsilä sign agreement to speed up fleet sustainability

The technology group Wärtsilä and Rio de Janeiro based Companhia Brasileira de Offshore (CBO) have signed an agreement for Decarbonisation Modelling.

Partners to build green ammonia-powered cargo ship

Green NortH2 Energy, Meriaura and Wärtsilä have signed Letter of Intent for building of a cargo vessel that runs on green ammonia.

DFDS deploys Wärtsilä Voyage’s SPECS technology onboard Selandia Seaways

DFDS’ ro-ro Selandia Seaways – which operates on a busy and challenging route – has been retrofitted with smart technology to provide 360° situational awareness

Wärtsilä to supply the propulsion machinery for four new fishing vessels

The 75 metre-long purser/trawler vessels are being built for different owners.

Wärtsilä and CLdN cooperate in building of innovative hybrid RoRo vessels

The ships are scheduled to be delivered in Q4 2024 and Q1 2025, and will operate on CLdN’s European network.

Recent articles

spot_img