The four new Konecranes RTGs are equipped with advanced safety and operational features, including an Anti-Truck Lift Prevention System and a gas-type fire prevention system.
At the same time, the Danish Energy Agency has narrowed down the site for the wind farm from 440 km2 to 286 km2 as a result of the site-investigations.