3.3 C
New York

Tag: SSCV

Wasaline has successfully completed sea trials following a major battery upgrade on board Aurora Botnia
More than 80 vessels from Jifmar’s fleet are being integrated into a unified digital ecosystem.

Heerema’s Sleipnir completes first wind project

Heerema’s SSCV Sleipnir has safely and sustainably transported and installed the six-legged, 2858 metric ton, and 46-meter tall jacket for the Hollandse Kust Zuid (HKZ) transformer station.

Sleipnir breaks own record with 10100 mT jacket lift

Heerema’s SSCV Sleipnir has safely and sustainably removed Shell’s 10100 mT Brent Alpha jacket. This single jacket lift breaks Sleipnir’s recent record for lifting the 8100 mT Jotun-B jacket.

Sleipnir breaks records at the Jotun Field

Heerema’s SSCV Sleipnir has set another record – this time, for the largest single lift jacket removal.

Wärtsilä thrusters contribute to successful sea trials for Heerema’s SSCV

Performance of the propulsion solutions supplied by the technology group Wärtsilä exceeded the design specification and contributed to the success of the sea trials...

Recent articles

spot_img