The Port of Long Beach was awarded $20 million by the California Energy Commission to fund the ongoing development of Pier Wind, a proposed 400-acre terminal to assemble and deploy floating offshore wind turbines.
The project comprises three wind turbines, each with 8-megawatt capacity, capable of generating enough electricity annually to meet the needs of approximately 45,000 households.
FLOWRA and EMEC will explore the possibilities of collaboration in establishing and managing an offshore test and demonstration site for floating wind technology development.
The Verti-Go project will demonstrate SeaTwirl's floating wind turbine technology with a 2MW turbine including the design, fabrication, installation and operation.
DNV has signed a two-year contract with Kolon Global Corporation to provide owner’s engineering services for the 400MW Wando Jangbogo Offshore Wind Power Project in Jeollanam-do, Korea.