Set to be the largest offshore wind project in Poland, the 1.2 GW wind farm will be located 23 km off the coast of the Polish Baltic Sea coast, near Łeba.
NKT has signed the order for the power cable system for the Polish offshore wind project Baltic Power. The project is important for the transition to renewable energy in Poland and the national ambitions of up to 11 GW offshore wind installed by 2040.
Cadeler has signed a firm contract with Baltic Power for the installation of 76 Vestas 15MW offshore wind turbines in the Polish Baltic Sea with a contract value of between 68-85 million EUR.
On June 17th, the “Grażyna Gęsicka” LNG carrier with an LNG cargo set off on its first voyage to Poland. The tanker will arrive at the President Lech Kaczyński Terminal in about two weeks.
OSI Maritime Systems (OSI) has been awarded a contract by PGZ Stocznia Wojenna Shipyard to provide Integrated Navigation and Tactical Systems (INTS) to the Polish Navy’s Kormoran program, vessels four to six.
"Strażak-28" is a firefighting vessel built for the Szczecin and Świnoujście Seaports Authority S.A. at the Gdańsk shipyard Remontowa Shipbuilding S.A.