2.8 C
New York

Tag: Offshore

Maersk completes divestment of Maersk Supply Service

At closing, A.P. Moller Holding, the parent company of the A.P. Moller Group, will assume full ownership of MSS.

Official opening of the Njord field – ready for 20 more years

The platform and the floating storage and offloading vessel (FSO) have undergone extensive upgrades and are now ready for doubling the field life – and more than doubling production.

Gazelle Wind Power acquires naval engineering firm F. Carceller

Spanish-based engineering firm will accelerate technical development of Gazelle’s floating offshore wind platform

OceanEnergy sign up to EMEC wave energy test berth

Irish wave energy developer, OceanEnergy, has signed up to demonstrate its OE35 floating wave energy converter at the European Marine Energy Centre (EMEC) in Orkney, Scotland.

IberBlue Wind announces offshore wind project on the Spanish-Portuguese border

The projects will cover a total area of 530 km2, and together the two projects will have an installed capacity of 1.96 GW

Port of Long Beach releases pier wind project concept

The Port of Long Beach has released plans for an ambitious facility conceived to help California and the nation reach renewable energy targets in the coming decades.

MODEC awarded contract by Equinor to supply the 2nd FPSO in Brazil

The FPSO vessel will be deployed at the field, located in the giant "pre-salt" region at the southern part of Campos Basin

ABB collaborates with Lhyfe and Skyborn on renewable hydrogen project

Together with Lhyfe and Skyborn, ABB will drive large-scale integration of production of offshore wind renewable hydrogen into the energy system in the SoutH2Port project

Equinor and partners announce final investment decision for BM-C-33, in Brazil

BM-C-33 will be Equinor’s second FPSO in Brazil using combined cycle gas turbines, significantly reducing carbon emissions during operations.

Nexans awarded agreement to support energy transition in Europe with TenneT

Under this frame, Nexans will be responsible for three grid projects, connecting the future offshore wind farms in the German North Sea to main land.

Saipem has completed the first installation campaign for the Dogger Bank project

Saipem will complete its scope of work with the installation of the topside for Dogger Bank B in 2024.

DEME awarded three contracts for Dieppe Le Tréport offshore wind farm

With 62 turbines located off Dieppe and Le Tréport, the wind farm is set to supply nearly 850,000 people with sustainable electricity.

Recent articles

spot_img