Construction on the project started in winter 2018 with commencement of the onshore works and the windfarm is expected to be fully operational in 2022.
4Subsea recently installed advanced, retrofit sensors on floating turbine Zefyros (previously Hywind Demo) to prove cost reduction potential with a Digital Twin.
Huisman and Jan De Nul Group has announced that they have joined forces for the heavy lift equipment on board of Jan De Nul’s Next Generation offshore installation vessels Les Alizés and Voltaire.
The latest round of testing of the BladeBUG inspect-and-repair robot for offshore wind turbine blades has successfully concluded at the Offshore Renewable Energy (ORE) Catapult’s National Renewable Energy Centre in Blyth.