On behalf of the license partners, Equinor has awarded two contracts and issued a letter of intent to TechnipFMC for pipelaying and subsea installation for three projects on the Norwegian continental shelf (NCS).
Generating 630MW, the London Array offshore wind farm produces enough energy to power approximately 470,000 homes, displacing approximately 500,000 tonnes of CO2 a year.
The Evac Evolution ballast water treatment system (BWMS) will be installed on the ILV Granuaile, an aids to navigation vessel operated by the Commissioners of Irish Lights.