Jumbo’s scope of work included transport and installation of 14 suction piles (part of a 14-point FPSO mooring system), a tie-in manifold and a 24 inch deepwater gas sales spool.
Earlier this month, Heerema’s Thialf completed the eight month long campaign to remove the Sable Project’s offshore facilities on behalf of client ExxonMobil Canada.
MODEC, in conjunction with Toray, has developed a repair method to restore hull strength to the necessary level by applying an engineering method known as VaRTM