The offshore installation vessel Les Alizés has already begun installing the 107 monopile foundations, including one for the Offshore Substation (OSS).
Jumbo’s scope of work included transport and installation of 14 suction piles (part of a 14-point FPSO mooring system), a tie-in manifold and a 24 inch deepwater gas sales spool.