Marinetrans has been awarded the project logistics contract for two Floating Liq...
Phase 2 of the project envisages the fabrication, transportation and installatio...
Sembcorp Marine awarded Master Service Agreements for the engineering, conversio...
Design Re-uses LNG Carrier Tanks to Simplify FLNG Construction
The milestone cargo was successfully loaded on 25 September 2021 onto the Seri C...
The cargo was loaded onto the Seri Camar LNG Carrier operated by MISC Bhd for sh...
With increasing global concern for the environment, clean gas-based energy plays...
Through these extensive tests, DSME have verified that the new hull design and t...