MODEC has been awarded a contract by ExxonMobil Guyana Limited to develop a Floa...
Through this joint study, Idemitsu and MC will accelerate their study on structu...
QatarEnergy has signed a farm-in agreement with ExxonMobil to acquire a 40% part...
The first contract has been awarded by ExxonMobil’s subsidiary ExxonMobil Guyana...
Svitzer has announced that it has secured a 7-year contract with ExxonMobil to p...
Saipem has been awarded new contracts for a total amount of approximately 1.2 bi...
MODEC will design and construct the FPSO based on its M350 new-build design. Uar...
Van Oord and Subsea 7 have been contracted by ExxonMobil affiliate Esso Explorat...
Seabob and Kiru-Kiru wells in Stabroek block are sixth and seventh discoveries i...
Production to increase from 77 million tons to 110 million tons per year
The agreement brings together the technical and commercial capabilities necessar...
The three discoveries are southeast of the Liza and Payara developments and brin...
The company’s fourth, and largest, project in the Stabroek Block is expected to ...
QatarEnergy entered into an agreement with ExxonMobil to acquire a working inte...
Production from Liza Unity vessel to reach 220,000 barrels of oil per day later ...
ExxonMobil has said it made two oil discoveries at Fangtooth-1 and Lau Lau-1 in ...