2.5 C
New York

Tag: Digital twins

The Dragon 12 powerplant has been installed (grid-connected) for 9 months since May 2025 and has provided valuable production and operational data.
The eighth and final vessel scheduled for delivery to the Commonwealth in 2038.

DNV GL develops and tests a methodology for the qualification of digital twins

Digital twins can significantly enhance efficiency and reduce cost, but oil and gas operators are increasingly demanding proof that they can be trusted and deliver value over time

Digital twins and sensor monitoring

DNV GL has developed a methodology for hull condition monitoring that incorporates the use of the ship’s digital twin

Recent articles

spot_img