7.1 C
New York

Tag: DEME

DEME awarded the Abu Qir port project in Egypt

The largest ever dredging and land reclamation contract in its history

SMST’s offshore access and lifting in one for DEME

DEME’s SOV 'Groene Wind' will be chartered by Siemens Gamesa Renewable Energy for the Rentel and Mermaid & Seastar (referred as SeaMade) offshore wind farms in Belgium.

DEME joins European Clean Hydrogen Alliance

The European Clean Hydrogen Alliance aims to initiate an investment agenda and support the scaling up of the hydrogen value chain across Europe.

DEME: ‘Green Jade’ steel cutting gets underway

In a strong signal highlighting its confidence in the offshore wind sector, CSBC-DEME Wind Engineering (CDWE) held a strike steel ceremony today in Taiwan, when work officially began on its pioneering installation vessel ‘Green Jade’.

VIDEO: Installation of spuds on the world’s largest cutter suction dredger

The concept and basic design for this mega cutter was done in close cooperation with DEME, Vuyk Engineering Rotterdam (a 100% subsidiary of IHC) and IHC.

650 km of inter-array cable to be installed at world’s biggest wind farm

DEME Offshore signs contract for largest ever inter-array cable order with Dogger Bank wind farm

Port of Antwerp: the solution to the ecological problem is finally found

The Flemish government, Port of Antwerp and SeReAnt together improve the water quality at the Port of Antwerp

ABS to class first taiwan-built offshore installation vessel

ABS is to provide classification services to the first floating heavy lift and installation vessel to be built in Taiwan.

First jacket installed at Moray East, Scotland’s largest offshore wind farm

DEME Offshore has mobilised the replacement vessel ‘Scylla’ for the jacket installation.

Turbine installation kicked off at SeaMade, Belgium’s largest offshore wind farm

DEME Offshore has installed the first turbine at the SeaMade offshore wind farm in the Belgian North Sea.

Ørsted and DEME Offshore complete installation of Borssele 1&2 foundations

The wind farm will be completed by the end of this year

Oosterweel link project: DEME to build the Scheldt tunnel

The tunnel has a total length of 1,800 m and will be built according to the ‘immersed tube’ method.

Recent articles

spot_img