Konecranes will deliver two eco-efficient Konecranes Gottwald Model 7 Mobile Harbor Cranes to Tincan Island Container Terminal Limited (TICT) in Lagos, Nigeria.
One crane weighs approximately 1600 tons. All Port of Oakland container cranes are powered by electricity, so there are zero local emissions from routine crane operations.
Bakker Sliedrecht will electrify the crane vessels Thialf and Sleipnir of Heerema Marine Contractors so that they can be powered with green shore power.
The Norwegian Wergeland Group and PSW Group have announced that they have signed a Letter of Intent with Huisman for the delivery of a Skyhook quayside crane at the Gulen Industrial Harbour, Norway.