7.5 C
New York

Tag: Aker BP

Aker BP and Framo sign smart contract for offshore maintenance

Aker BP and Framo have entered into a long-term contract for seawater lift pumps where compensation is directly linked to facility uptime. This is...

Aker BP strengthens its position in the Skarv area

Aker BP has entered into an agreement with PGNiG Upstream Norway AS to swap its 3.3 percent interest in the non-operated Gina Krog field...

Aker BP and Cognite will do tests using robots and drones in the Norwegian Sea

Aker BP and Cognite today announced a strategic initiative to explore how robotics systems can be used to make offshore operations safer, more efficient...

Aker BP to use Maersk Integrator rig at Ivar Aasen

Maersk Drilling has secured a two-well contract extension from Aker BP for the ultra-harsh environment, low-emission jack-up rig Maersk Integrator. In direct continuation of the...

First oil was produced from Valhall Flank West in the North Sea

Operator Aker BP and partner Pandion Energy reported that first oil was produced from Valhall Flank West in the North Sea. Through the development...

Aker Solutions to provide subsea production system for Aker BP’s Ærfugl

Aker Solutions has been awarded a contract from Aker BP to deliver the subsea production system for the second phase of the Ærfugl development...

Aker BP first ever to use new well stimulation method offshore

The first successful “Single-Trip Multi-Frac” campaign has been executed on the Valhall field. This specific method of well stimulation has never been done offshore...

Ærfugl’s Phase 2 will come three years ahead of the original plan

The Ærfugl partners have decided to proceed with Phase 2 of the Ærfugl project in the Norwegian Sea, three years ahead of the original...

Production from the giant field in the North Sea is started

On 5 October Equinor and the Johan Sverdrup partnership consisting of Lundin Norway, Petoro, Aker BP and Total, started production from the giant field...

Valhall Flank West successfully installed

The Valhall Flank West topsides were installed on the Valhall field on Saturday, 22 June. This is just 14 months after the first steel...

Pioneering Spirit removes Valhall QP topsides

Allseas’ Pioneering Spirit has removed the QP accommodation platform topsides and connecting bridge from the Aker BP-operated Valhall field

Eidesvik awarded PSV contract by Aker BP

Norwegian OSV owner Eidesvik has been awarded a contract by Aker BP for the charter of its 2012-built platform supply vessel Viking Prince.

Recent articles

spot_img