3.4 C
New York

Wind Energy

Equinor and partner reach financial close on world’s biggest offshore wind farm

SSE Renewables are leading the construction of the 3.6 GW project, and Equinor will lead on the wind farm’s operations.

Ørsted signs one of the world’s largest route-to-market agreements with Dogger Bank

Ørsted to trade and balance 15 years of power generation from the offshore wind farm Dogger Bank Wind Farm.

Bolloré successfully transports the components of the Goldwind Moorabool wind farm

The equipment was transported by sea from the manufacturing sites in China to the Port of Geelong in Victoria State

NABTU and Ørsted sign MOU for U.S. offshore wind workforce transition

Pioneering Partnership to Develop the Next Generation of Offshore Wind Workers

Fugro and NYK set to expand offshore wind geotechnical services in Japan

Fugro and NYK Group (NYK) have signed a Memorandum of Understanding (MOU) to provide offshore geotechnical services in Japan.

First ever V164-9.5 MW turbine installed on a floating wind project Aarhus

MHI Vestas has now installed the first V164 9.5 MW turbine, the most powerful turbine in use at a floating wind project, at the installation harbour for the Kincardine floating offshore wind farm.

ABB’s OCTOPUS software employed for ATLANTIS offshore project

ABB optimization software for EU-funded ATLANTIS research project will advance remote maintenance of offshore wind farms to reduce costs, increase efficiency and safety, and improve sustainability

PSA Marine forges ahead with offshore wind in Europe

Sustainability-linked loan granted by DBS marks first in Singapore’s maritime industry

Triton Knoll marks a series of project ‘firsts’ as blades arrive at Seaton Port

Turbine blades destined to be installed at the 857MW offshore wind farm, arrive at its chosen construction port in Teesside.

Floating wind turbine “Nezzy²” passes its second test in the Baltic Sea

In the Bay of Greifswald, 180 sensors were used in 30 different measurements to establish how Nezzy² behaves when exposed to different wind directions and speeds as well as wave heights and directions.

The Carbon Trust launches the fourth stage of the Offshore Wind Accelerator

Offshore wind majors signal continued commitment to R&D as next stage of the Offshore Wind Accelerator gets the green light

Launch of research and development to reduce cost of floating offshore wind turbines

This research and development will be carried out for two years until March 2022

Recent articles

spot_img