When operational, the 433 km trunkline will transport gas from the offshore Scarborough field to the onshore Pluto LNG processing facility in Karratha.
Van Oord has successfully completed the construction of the Floating Storage and Regasification Unit (FSRU) jetty at Wilhelmshaven, Germany for its client Deutsche Energy Terminal (DET).
Wildcat well was drilled in production licence 827 SB from the Awards in predefined areas (APA) in 2022. The well was drilled using the Deepsea Atlantic rig.
On Saturday, 7 September, Troll B and C became partly powered from shore. This reduces annual emissions from the Norwegian continental shelf (NCS) by 250,000 tonnes of CO2.