If the outcomes of the work considered by the MOU are successful, it would enable post-combustion carbon capture to be offered as a standard offering on future FPSO projects.
A wildcat well drilled by Harbour Energy Norge and licensees in the “Havstjerne” storage project confirmed a reservoir that is suitable for injection and storage of carbon dioxide (CO2).
Aker Solutions has successfully installed an autonomous drone system on Aker BP's Edvard Grieg platform in the North Sea, enabling frequent, remote inspections from shore.
The Scarborough Energy Project has achieved a major engineering milestone with the joining together of the topsides and hull for the Floating Production Unit (FPU).
McDermott announces the safe, successful completion of fabrication, construction, and offshore floatover of the Scarborough floating production unit (FPU) topside and hull structures for Woodside Energy.