Based on extensive analyses and mapping of damages, Equinor has updated the schedule for repair and start-up of the LNG plant on Melkøya after the fire on 28 September 2020.
As a result of this melting, the planet's bright, reflective surfaces decrease in area. And as a result of that decrease, even more sunlight is absorbed by the surface, resulting in greater warming.
NKT has been awarded a contract for the Troll West electrification project of approx. EUR 95m (approx. DKK 710m) by Equinor Energy AS on behalf of the Troll Unit.
Anson, the fifth of seven Astute class attack submarines being built for the Royal Navy, has been launched at BAE Systems' site in Barrow-in-Furness, Cumbria.