Equinor and Polenergia have selected Hitachi Energy to deliver electrical systems infrastructure for the MFW Bałtyk II and MFW Bałtyk III offshore wind projects in Poland.
The dual-derrick drillship is the first-ever unit delivered with two 20,000-psi blowout preventers (BOPs), well-control, riser, and piping systems for high-pressure and high-temperature drilling and completion operations.
Integrated energy hubs have the potential to combine multiple energy systems, including existing oil and gas production assets, carbon storage and hydrogen production facilities.