This is the 178th vessel Bollinger has delivered to the U.S. Coast Guard over a 35-year period and the 52nd Fast Response Cutter (“FRC”) delivered under the current program.
The Deepsea Star™ will be available for deployment from the mid 20's and the design is already being considered for several oil and gas electrification projects in the North Sea.
A minimum of 104 wind turbines, each with an installed capacity of 15 megawatts expected to be installed off the German island of Juist starting in 2026