In addition, Konecranes Port Services will retrofit eight existing Konecranes RTGs currently operating at the port. The retrofits will be completed by Q4 2025.
After a construction period of 22 months, the Cruise Port Shore Power installation was officially opened on 31 March, 2025, on the Holland Amerikakade.
AD Ports Group and Columbia Group have formed a joint venture to optimise third party vessel operations, and that of AD Ports Group’s ocean-going fleet, through state-of-the-art fleet management systems.
The simulator provides a highly realistic training environment, allowing course delegates to practice complex operations and emergency preparedness in a fully immersive, controlled conditions.
AD Ports Group and Columbia Group have formed a joint venture to optimise third party vessel operations, and that of AD Ports Group’s ocean-going fleet, through state-of-the-art fleet management systems.
The Saguenay Port Authority in Quebec has ordered a Konecranes Gottwald ESP.6B Mobile Harbor Crane for a new cargo handling system currently under development.
A portable coral aquaculture system that can be packed away and moved in sea containers to remote areas to help with coral reef restoration is being put through its paces in the Maldives for the coral spawning season.